Monday, May 31, 2010

Community Pier Update and Drainage Easement Resolution

Philip Hanley with ERGIS Environmental did arrive on-site this past week and has staked out the community pier location within the common area from the HighWaterMark out into the water. This includes marking of the boardwalk that will go over the wetlands from the uplands trail and connect to the fishing pier at the water.
The pier contractor, Tidelands Piers and Bulkheads, is finishing up on a big pier project in Galveston and will be moving to our area with in the next two weeks.
Also the Drainage Easement violation off of Sunrise Drive has been corrected while Philip Hanley was on-site with a contractor performing the work needed to correct the drainage easement. The Corps of Engineers representative came out, inspected, and approved the Drainage Easement after the work was completed and documented by Philip Hanley.

Kelly Flanagan
President
POA of Sunset Bay,Inc

Sunday, May 16, 2010

2010 Annual Members Meeting Date

The Annual Members Meeting for the Property Owners Association of Sunset Bay, Inc is scheduled for August 07, 2010, 02:00 pm at the Woman's Club of Aransas County, Inc. in Rockport, TX.
Sunset Bay Members, please check your calendars and reserve this day to come to Rockport to attend this important meeting and have a great time visiting the Rockport area.
A formal meeting notice will be mailed out in July with pertinent information.

Kelly Flanagan
President
POA of Sunset Bay, Inc

Tuesday, May 11, 2010

Property Improvements Application

Please note the ACC Request and Review form on the documents page of the Sunset Bay website. This document must be filled out and sent in the POA Architectural Control Committee and Sunset Bay board for review and approval for any improvements to your property that is not covered in the New Home Application.
Some examples would be Fencing, Culverts, Mailboxes, Barns where applicable for horses, dirt work or leveling on lot that would change the normal lot elevations, etc.  
Please contact the POA if you have any questions.
Thank you.

Sunset Bay Board of Directors
Property Owners Association of Sunset Bay, Inc 

Community Pier Update...Great News!!!

Philip Hanley with ERGIS Environmental contacted me by phone today and has finally arranged in his busy work schedule to be in Sunset Bay on May 19-20 to stake off the wetlands boundaries in the common area and stake off the location of the community pier as well.
Philip is to meet with the contractor that will be correcting the Drainage Easement violation that runs into the wetlands and the pier builder contractor for the staking out of the pier location before construction can commence. It has been a long time coming.
I will also be on-site meeting with Philip Hanley and the contractors going over the details on the work to be done initially to get things going.

Kelly Flanagan
361-550-1683
President
POA of Sunset Bay, Inc

Hooray!!!

Well!!! You gotta see to believe it, Cooper Outdoor Signs is actually removing the big double decker outdoor advertising sign at the Sunrise Dr entrance into Sunset Bay community. I know this is making a lot of people happy to see this thing go.
 I called and spoke with Gordon Cooper, President of Cooper Outdoor Signs and told him the Sunset Bay community appreciated him removing the sign as he had promised and he said he appreciated the courtesy call.

Kelly Flanagan
President
POA of Sunset Bay Inc